Right to the three LH2 pipes, the LOX pipes are striving upwards. As we all know, 'LOX' means 'liquid oxygen'.

LOX pipes at Side 3

LOX pipes at Side 3

Long live diversity. For 6 pipe anchors, 5 different constructions - multi-cultivation in the style of NASA engineers. Here on level 30 you see the lowest LOX-valve complex.

If you say hang on a minute, the three LOX pipes were already there anyway, tell me something new - that's right. But thumb x pi after photos. But now exactly according to plan, or rather plans. Many many plans *ggg*

LOX pipes at Side 3

LOX pipes at Side 3

The LOX lines are thriving and stop at level 120 ...

LOX pipes at Side 3

LOX-Valve-Complex at Level 120

... where another LOX-valve complex is located. Together with the LH2-valve complex it makes a nice rendezvous of artfully woven pipelines. You will be pleased to know that I construct 4" pipes and below as stripes.

LOX-Valve-Complex at Level 120

LH2-Valve-Complex at Level 120

After assembly, all you have to do is to embed the pipe work into the LUT. Somehow.

The LH2 & LOX pipes are finished - time for a real world comparison:

LH2-Valve-Complex at Level 120

Rollout of Apollo 17. Courtesy of NASA

... a certain similarity can indeed not be denied ;)

LOX valve complex

LH2 pipes at Side 3

We now enter level 200 and take a look at the pipe massacre ...

LH2 and LOX pipes at Side 3

LH2 pipes at Side 3

... and again an overview.

LH2 pipes at Side 3

LH2 pipes at Side 3

Next will be the pipes on side 2 - these were intended for the operation of the LUT itself.